FAQ Q&A
No, power supply is not required.
It is recommended to only conduct the test on the anchor without any other installations, however for areas where the installations are already installed, test may still be conducted if there is no obstruction to the testing point.
No, rebars have to be straight, untied without links and/or formwork for pull out test to be conducted.
Prior to the test date, kindly ensure that all relevant parties/authorities are present at the time of testing. Safe access and working platform should be provided at the location at the job site.
Yes. Kindly contact your dedicated Hilti Account Manager for more details.
Method of statement can be downloaded from the user manual page.
No, drawing is not required by Hilti Tester.
Select dedicated support during booking. Hilti provides testing beyond 2.5% at a competitive rate below:
Office hour Dedicated Support
(Monday to Friday from 9:00 a.m. to 6:00 p.m. and excluding Public Holiday, subject to availability) Request
|
Charges |
Half Day (3 hours) |
SGD300 |
Full Day (7 hours) |
SGD600 |
Hilti will test in accordance to our latest Anchor Fastening Technical Manual(FTM) unless a different specified test load is provided by our customer. Refer to User Manual page for our test loads.
Hilti Tester will wait 45mins from the agreed time and will leave for the next appointment should the testing cannot commence.
The test report which is signed and issued on site by the Hilti Tester immediately after the test is the official test report. There will not be any other soft copy test report sent out.